PROJECT

City of Sydney

Banga Community Shed Mains Replacement

CLIENT

City of Sydney

SERVICE

Switchboards

LOCATION

Zetland, NSW

TIMELINE
Feb-May 2024

PROJECT INFORMATION

Platinum Electricians was engaged to upgrade the electrical infrastructure at the Banga Community Shed to support the growing demands of the facility. This project included the installation of a new Main Switchboard (MSB), the replacement of mains, and ensuring compliance with current safety and operational standards. The project was completed with a focus on minimising disruption to the community and ensuring a seamless transition to the upgraded system.

banga-banner

OBJECTIVES & PRIORITIES

objectives-_fit for purpose
Fit for Purpose
(compliant)
objectives-_quality workmanship
Quality
Workmanship
minimal-disruption-icon
Minimal
Disruption
energy-icon
Sustainable
Solutions

SCOPE OF WORKS

  • Conducted a one-week data logging to determine the maximum demand of the existing MSB.
  • Submitted a load application to Ausgrid for additional power requirements.
  • Supplied and installed a new 2000A MSB along with necessary infrastructure.
  • Installed fire-rated consumers mains and submains to ensure safety and reliability.
  • Managed all necessary excavation and backfill works.
  • Completed meter exchange and coordinated mandatory inspections.
  • Provided detailed documentation upon project completion.
banga2
banga4
banga3

PROJECT ACHIEVEMENTS

  • Seamless Power Upgrade: Successfully upgraded the MSB without significant disruptions to the community shed's operations.

  • Safety Compliance: Ensured all installations met the highest safety standards, including fire-rated mains and secure connections.

  • Efficient Coordination: Effectively managed coordination with Ausgrid for load applications, inspections, and meter exchanges.

  • Detailed Documentation: Provided comprehensive as-installed drawings, single line diagrams, and O&M manuals, ensuring the facility's maintenance team is well-equipped for future needs.

  • Timely Completion: Delivered the project within the stipulated timeline, with the new circuit to the school scheduled for installation by 01/08/24.