PROJECT INFORMATION
This project was part of the flood recovery efforts of a local Council in the Brisbane region, aimed at repairing damage caused by the 2022 floods to a section of the street light cable along the Bicentennial Bikeway and Pedestrian Walkway.
Platinum redesigned the installation, which involved re-cabling the section of the streetlights that were affected by the floods. To achieve this, the cable joins were be moved from inside the junction boxes and relocated to the inspection plates at a higher point in the light poles.
Scope of Works:
- Obtained traffic permit and provided traffic control for the work area
- Set up scaffolding and under bridge unit - MBI50 Crawler UBIU
- Modified existing conduit and junction boxes to accommodate a 50mm conduit and seal afterwards
- Ran 2 x 16mm2 Twin flat XLPE/PVC copper and 2 x 16mm2 earth conductors without any joins in the boxes
- Installed two new circuits, each with RCBO protection
- Provided overload protection, and an approved methodology of termination at the access panel in each pole
- Completed works at night when required due to traffic permit requirements.
OBJECTIVES & PRIORITIES
Fit for Purpose
(compliant)
(compliant)
Quality
Workmanship
Workmanship
Minimal
Disruption
Disruption
Sustainable
Solutions
Solutions
PROJECT ACHIEVEMENTS
- Collaborating with an RPEQ to guarantee the well-being of our employees and the stability of the structure during bridge operations.
- Discovered a cost-efficient and appropriate alternative when the current conduits were obstructed, ensuring that the project was completed within the designated time and budget.
- Devised a plan to maintain adequate lighting for the bikeway throughout the project.
- Created or executed novel processes, frameworks, and techniques.
RECENT PROJECTS
TOUCH
TESLA MOTORS AUSTRALIA EV Supercharging Station Installation
TOUCH
AMAZON Mezzanine Power and Lighting Fit Out
TOUCH
ST DAVID'S RETIREMENT VILLAGE Generator & Switchboard Upgrade