PROJECT
Greater Metropolitan
Cemeteries Trust (GMCT)
LED Upgrades Across Multiple Sites
GMCT
Lighting
Melbourne Region
PROJECT INFORMATION
The Greater Metropolitan Cemeteries Trust (GMCT) embarked on a comprehensive LED upgrade project across multiple sites resulting in 31,535 watts savings after transitioning to LED lighting.
SITES:
- Fawkner Cemetery
- Altona Cemetery
- Keilor Cemetery
- Williamstown Cemetery
- Preston Cemetery
- Templestowe Cemetery
- Lilydale Memorial
OBJECTIVES & PRIORITIES
(compliant)
Workmanship
Disruptions
Solutions
SCOPE OF WORKS
Fawkner Cemetery
- Regional Office: Replaced 22 old LED lights with 22 Low Glare LED panels.
- Holy Angels Mausoleum: Replaced various lighting fixtures, achieving substantial energy savings.
Altona Cemetery
- Chapel Pelmet Lighting: Removed 192 36-watt Fluorescent lights and installed 154x22-watt 5-foot LED battens.
Keilor Cemetery
- Mausoleum Crypt Upgrade: Upgraded 1,476 crypt lights from 3-watt to 1-watt LED modules.
Williamstown Cemetery
- Mausoleum Crypt Light Upgrade: Replaced various lights with energy-efficient LED alternatives.
- Eave Lighting: Replaced 26x 52-watt compact fluorescent downlights with 18-watt LED downlights.
Preston Cemetery
- Street Lights: Replaced street lights with LED alternatives and optimized control systems.
- Administration Building: Upgraded various lighting fixtures for increased energy efficiency.
Templestowe Cemetery
- Street Lights: Replaced 25 x 35-watt BC with LED BC Globes (4 watts).
- Workshop/Administration Building: Comprehensive upgrade of various lighting fixtures for energy efficiency.
Lilydale Memorial
- Mausoleum LED Upgrade: Replaced 410 3-watt halogen crypt lights with 1-watt LED modules.
- Workshop High Bay Upgrade: Enhanced safety measures and replaced high bay lights with energy-efficient alternatives.
KEY ACHIEVEMENTS
Flexible Working Hours
To minimise disruption to regular cemetery activities, the project embraced flexible working hours. This approach ensured that the LED upgrades were seamlessly integrated into daily operations without compromising the respectful and serene environment of the cemeteries.
Special Industry Considerations
Recognising the unique nature of cemetery settings, special considerations were incorporated into the project plan. Delicate areas, such as mausoleums and memorial spaces, were handled with the utmost care and sensitivity to maintain the sanctity of the surroundings.
Utilising National Buying Power
GMCT leveraged Platinum's national buying power and longstanding relationships with suppliers to keep material costs at a minimum. This strategic approach allowed the project to achieve cost-effective LED solutions without compromising on quality, directly benefiting the client.
Dedicated Project Manager
A dedicated project manager oversaw the entire LED upgrade initiative, ensuring smooth coordination and timely execution. This hands-on approach facilitated effective communication, efficient problem-solving, and a streamlined project timeline.
The successful implementation of these LED upgrades showcases GMCT's commitment to sustainability, significantly reducing energy consumption across multiple cemetery sites in the Melbourne region.
RECENT PROJECTS
TESLA MOTORS AUSTRALIA EV Supercharging Station Installation
AMAZON Mezzanine Power and Lighting Fit Out
ST DAVID'S RETIREMENT VILLAGE Generator & Switchboard Upgrade