OUR SERVICES
PROJECT
Hollywood Private Hospital
LED Lighting Upgrade
CLIENT
Ark Renewable Group
SERVICE
Lighting Upgrade
LOCATION
Perth
TIMELINE
2023
PROJECT INFORMATION
Platinum were engaged by Ark Renewable Group to upgrade the lighting across multiple buildings within Hollywood Private Hospital.
What was involved:
- Delivery and management of materials and light fittings on site
- Removal of existing suspended and surface mounted fittings
- Recycling of existing materials and light fittings in line with Platinum’s environmental plan and policies
- Installation of new hardware and fittings
- End to end project management
- Project safety and development of WHSMP
- Close consideration of the environment that we’re working in to not disrupt equipment and services
- Lighting designs
- Completion and compliance paperwork as required for management of lighting rebates
OBJECTIVES & PRIORITIES
Fit for Purpose
(compliant)
(compliant)
Quality
Workmanship
Workmanship
Minimal
Disruption
Disruption
Sustainable
Solutions
Solutions
PROJECT ACHIEVEMENTS
- Devised universal lighting solutions applicable to all areas, alongside innovative cyanosis lights that seamlessly integrate with current fixtures.
- Significantly reduced costs for customers by implementing a complete LED lighting upgrade.
- Conducted comprehensive audits of each location and presented a detailed financial analysis showcasing substantial cost savings.
SCOPE OF WORKS
STAGE ONE (Complete)
- 859x LED panels
- 749x LED Battens
- 190x Downlights
- 65x Oyster Lights
- 163x 413s
- 44x Surface Mounted
- 28x Emergency Batten
- 6x Emergency Lights
- 174x 3D Printed Clips
- 11 x Perspex Panels
TOTAL INSTALLED: 1908
STAGE TWO
- 426x (1200x300) Panels
- 11x (600x600) Panels
- 3x Weatherproof Battens (600mm)
- 13x Weatherproof Battens (1200mm)
- 205x Downlights (110/95)
- 108x Cyanosis Panels (1200x300)
- 302x Standard Battens.
- 32 LED oysters
RECENT PROJECTS
TOUCH
TESLA MOTORS AUSTRALIA EV Supercharging Station Installation
TOUCH
AMAZON Mezzanine Power and Lighting Fit Out
TOUCH
ST DAVID'S RETIREMENT VILLAGE Generator & Switchboard Upgrade