PROJECT
St David's Retirement Village
Generator & Switchboard Installation
CLIENT
Anglicare
SERVICE
Switchboards & Generator
LOCATION
Forestville NSW 2087
TIMELINE
5 weeks
PROJECT INFORMATION
The retirement village required the installation of a back up generator, which would also involve the installation of a new main switchboard with an ATS (Automatic Transfer Switch) to change over from mains supply to generator supply in the event of a power outage.
OBJECTIVES & PRIORITIES
Fit for Purpose
(compliant)
(compliant)
Cost
Savings
Savings
Quality
Workmanship
Workmanship
Minimal
Disruptions
Disruptions
SCOPE OF WORKS PERFORMED
- Installation of Generator
- Installation of new Main Switchboard
- Modification of existing Main
- Switchboard to turn it into a Main
- Distribution Board
- Installation of temporary power for the duration of the shutdown
- Close coordination with supply authority
- Installation of temporary fencing and traffic/pedestrian management
- Civil works including concrete cutting, installation of trafficable pits, installation of a new concrete walkway
- Installation of underground consumer mains, submains and underground conduits
- Reinstatement of all hard surfaces and line marking of car park
- Reinstatement of all turf and garden beds
- Supply of O&M (Operations & Maintenance) Manuals, compliance documentation and as-built/as-installed drawings
PROJECT CHALLENGES
- The project involved concrete cutting and trenching through the main village car park for the installation of the generator submains. Traffic management and pedestrian management was required for the duration of the project, as well as close coordination with village staff to ensure minimal impact to the operations of the site.
- A 16 hour shutdown was required to safely cut over to the new main switchboard. Temporary power was set up for the duration of the shutdown to maintain power to all critical equipment, as well as lighting for the residents safety.
KEY ACHIEVEMENTS
- Project completed on time and on budget
- Successful installation of the back up generator to now supply temporary power to the village in the event of a power outage
- Successful completion of works over the 5 week program with minimal impact to residents and the operations of the village
- Close communication and coordination with all key stakeholders
COST SAVING INITIATIVES
Modification of the existing main switchboard to turn it into a main distribution board, saving on the cost of a new board being built.
RECENT PROJECTS
TOUCH
TESLA MOTORS AUSTRALIA EV Supercharging Station Installation
TOUCH
AMAZON Mezzanine Power and Lighting Fit Out
TOUCH
ST DAVID'S RETIREMENT VILLAGE Generator & Switchboard Upgrade